3.4. Run UR with a project edited within Excel¶
After having imported an external UR-Project, given in the Project file as text file in .TXP format ,

The data can be edited in Table4.
Then, the three steps of exporting Table4 into an external csv file, executing it with UR and re-importing the results record(s) can be invoked with a single Button in Table7:
